Thursday, 4 October 2007

Mast work and Bridport from above!








We got a chap in to help with the mast work, fitting a Radar, two VHF radio aerials and the wind indicator. With the necessary work finished and all the gear stowed we were able to start off. It has taken us a lot longer to fit her out with all the equipment then we thought it would. The instruments that were already onboard should have been calibrated but we found out they’re not! The jobs on board seem to have a way of appearing….we do one job and find two more!!